News
November 24, 2026

FlatironDragados’ Georgetown Treatment Station Earns National Architecture Award

Construction Owners Editorial Team

Highlights

  • Seattle’s Georgetown Wet Weather Treatment Station received a 2026 American Architecture Award in the Industrial category.
  • FlatironDragados served as general contractor for the King County infrastructure project.
  • The facility can treat up to 70 million gallons of stormwater and wastewater daily during overflow events.
  • The project can reduce untreated discharges into the Duwamish River by up to 95%.
  • The station previously earned Envision Platinum recognition, becoming Washington’s first project to receive the designation.

Architecture Recognition for Critical Water Infrastructure

A major wastewater infrastructure project in Seattle has received national recognition for combining operational performance with architectural design and environmental restoration.

The Georgetown Wet Weather Treatment Station received a 2026 American Architecture Award in the Industrial category from The Chicago Athenaeum Museum for Architecture and Design. The award recognizes the project's integration of architecture, infrastructure, art and ecological restoration.

FlatironDragados served as general contractor for the King County facility, located in Seattle’s industrial core.

Treatment Capacity Supports River Protection

The station is designed to treat up to 70 million gallons of stormwater and wastewater per day during overflow events. Its operation can reduce untreated discharges into the Duwamish River by as much as 95%.

The project has also received recognition for its construction and sustainability achievements. It earned ENR West Northwest’s 2025 Best Water/Environment Award and the Northwest Construction Consumer Council’s 2023 Innovation & Achievement in Sustainability Award.

Additionally, the facility became the first project in Washington to achieve Envision Platinum recognition from the Institute for Sustainable Infrastructure.

Why It Matters

The Georgetown station demonstrates how large-scale water infrastructure can address wastewater overflow while contributing to environmental protection and the surrounding urban landscape.

For public owners and infrastructure contractors, the project highlights the importance of integrating treatment capacity, sustainability and design considerations into essential municipal facilities. Its recognition also underscores the role of complex infrastructure projects in reducing pollution risks for local waterways.

Source: FD Corp.

Get the inside scoop on the latest trending construction industry news and insights delivered straight to your inbox.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.