News
August 10, 2026

FlatironDragados Project Receives UCON Safety Award for Upper San Leandro Water Treatment Plant Work

Construction Owners Editorial Team

Highlights

  • The Upper San Leandro Water Treatment Plant project received the 2025 UCON R.E.A.L. Safety Award in the Most Unique Safety Project category.
  • The recognition honors outstanding safety leadership, workforce protection, and jobsite safety performance.
  • FlatironDragados is modernizing the nearly century-old treatment plant while maintaining continuous operations.
  • The project includes construction of a 165-foot-diameter compression ring, one of the largest of its kind.
  • The upgrades are intended to improve water quality, modernize infrastructure, and enhance long-term system reliability.

Safety performance on a complex water infrastructure project in California has earned industry recognition as contractors continue work to modernize an aging treatment facility while keeping it operational. The award highlights the importance of safety management on technically challenging projects involving active utility infrastructure.

Safety Recognition for Active Water Infrastructure Project

The Upper San Leandro Water Treatment Plant project in Oakland, California, received the 2025 United Contractors Recognizing Excellence, Awareness and Leadership in Safety (UCON R.E.A.L.) Safety Award in the Most Unique Safety Project category.

According to the award program, submissions were evaluated anonymously based on demonstrated performance in safety leadership, workforce protection, and the development of strong safety practices throughout project execution.

Modernizing a Century-Old Treatment Facility

FlatironDragados is upgrading the nearly 100-year-old Upper San Leandro Water Treatment Plant while maintaining uninterrupted plant operations during construction.

The project is designed to improve water quality, replace aging infrastructure, and increase the long-term reliability of the facility serving East Bay communities.

A notable element of the work is the construction of a 165-foot-diameter compression ring, identified as one of the largest structures of its type.

Why It Matters

Water and wastewater infrastructure upgrades frequently require construction within active facilities, making safety planning and operational coordination critical to project success. Recognition for safety performance on these projects highlights the industry's continued emphasis on protecting workers while maintaining essential public utility services during construction.

Source: Flatiron Dragados.

Get the inside scoop on the latest trending construction industry news and insights directly in your inbox.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.